Material waste starts long before materials reach the jobsite. Disconnects between design, estimating, procurement, and field teams lead to inaccurate takeoffs, premature ordering, and poorly timed deliveries. These breakdowns result in unused stock, damaged goods, and labor hours lost to searching, reordering, or waiting. This guide outlines how to prevent those losses through better upstream planning.
It offers practical steps to structure more accurate material forecasting, build tighter alignment between orders and site readiness, and time deliveries to actual usage windows. It also covers how to introduce checkpoints in your workflows to reduce excess and prevent spoilage.
See how construction companies are using real-time data, vendor communication protocols, and mobile tracking tools to reduce material overruns, shorten delays, and protect margin on every job.
Download the guide and apply strategies that help your teams stay lean without slowing down the project.
Offered Free by: CMiC
See All Resources from: CMiC